KM Tubular

Q-26-0350 · Southbank Hospitality Group

Riverside bar — Crawford stools
Demo 19 Oct 2026
Accepted
Accepted 07 Sep 2026 — job J-26-0320
Southbank Hospitality Group · Trade pricing · 14 days · from ENQ-1182
Open job J-26-0320
Lines30 units · 2 lines
CodeProductFinishQtyUnitTotalMargin
KM-CRW-ST The Crawford Stool Black Satin 24 $361.00 $8,664.00 50%
KM-MSN-BT Mason Bar Table Black Satin 6 $400.00 $2,400.00 52%
Margin
Sell (ex GST)
$11,064
Material
$2,276
Labour
$3,240 · 45 h
Standard cost
$5,516
Margin
$5,548 · 50%
■ material■ labour■ margin
Standard cost is the BOM at today's material prices plus routing minutes at $72/h. Lead time 20 working days from acceptance.
KM Tubular
KM Tubular Industries Pty Ltd
403 Grieve Parade, Altona North VIC 3025 · (03) 9369 9808 · web@kmtubular.com.au
ABN 72 661 249 270
Quotation
Q-26-0350
Date 29 Aug 2026
Valid until 28 Sep 2026
Prepared by David Vesely
Prepared for
Southbank Hospitality Group
Attn: Luca Bertoni
luca@southbankhg.com.au
7 Riverside Quay, Southbank, VIC
ABN 57 602 118 443
Accepted
ItemFinishQtyUnitAmount
KM-CRW-ST The Crawford StoolBlack Satin24$361.00$8,664.00
KM-MSN-BT Mason Bar TableBlack Satin6$400.00$2,400.00
Subtotal (ex GST)$11,064.00
GST 10%$1,106.40
Total (inc GST)$12,170.40
Project: Riverside bar — Crawford stools Finish: Black Satin powder coat unless noted. Delivery: Delivered metro Melbourne, inside ground floor. Lead time: approx. 20 working days from acceptance and receipt of deposit. Terms: 14 days.
Designed & manufactured in Melbourne since 1969