Expired
Expired 19 Sep 2026
Derwent Design Supply · Dealer pricing · 30 days EOM · from ENQ-1212
Lines6 units · 1 lines
| Code | Product | Finish | Qty | Unit | Total | Margin | |
|---|---|---|---|---|---|---|---|
| KM-LUC-BN | The Luca Bench | Charcoal Metallic | 6 | $563.00 | $3,378.00 | 45% | |
Margin
- Sell (ex GST)
- $3,378
- Material
- $879
- Labour
- $994 · 13.8 h
- Standard cost
- $1,873
- Margin
- $1,505 · 45%
■ material■ labour■ margin
Standard cost is the BOM at today's material prices plus routing minutes at $72/h. Lead time 25 working days from acceptance.
KM Tubular Industries Pty Ltd
403 Grieve Parade, Altona North VIC 3025 · (03) 9369 9808 · web@kmtubular.com.au
ABN 72 661 249 270
Quotation
Q-26-0379
Date 20 Aug 2026
Valid until 19 Sep 2026
Prepared by Jackie
Prepared for
Derwent Design Supply
Attn: Tom Bramich
tom@derwentdesign.com.au
88 Elizabeth Street, Hobart, TAS
ABN 22 093 518 664
Expired
| Item | Finish | Qty | Unit | Amount |
|---|---|---|---|---|
| KM-LUC-BN The Luca Bench | Charcoal Metallic | 6 | $563.00 | $3,378.00 |
| Subtotal (ex GST) | $3,378.00 |
| GST 10% | $337.80 |
| Total (inc GST) | $3,715.80 |
Project: Hobart hotel — Luca benches
Finish: Charcoal Metallic powder coat unless noted. Delivery: Delivered metro Melbourne, inside ground floor.
Lead time: approx. 25 working days from acceptance and receipt of deposit. Terms: 30 days EOM.
Designed & manufactured in Melbourne since 1969