Accepted
Accepted 17 Aug 2026 — job J-26-0317
Stellar Hotels Group · Project pricing · 30 days EOM
Lines8 units · 2 lines
| Code | Product | Finish | Qty | Unit | Total | Margin | |
|---|---|---|---|---|---|---|---|
| KM-DAV-BS | Dave Bench Setting | Charcoal Metallic | 4 | $1,355.00 | $5,420.00 | 47% | |
| KM-MNG-BN | The Mango Bench | Charcoal Metallic | 4 | $665.00 | $2,660.00 | 47% | |
Margin
- Sell (ex GST)
- $8,080
- Material
- $2,439
- Labour
- $1,814 · 25.2 h
- Standard cost
- $4,253
- Margin
- $3,827 · 47%
■ material■ labour■ margin
Standard cost is the BOM at today's material prices plus routing minutes at $72/h. Lead time 25 working days from acceptance.
KM Tubular Industries Pty Ltd
403 Grieve Parade, Altona North VIC 3025 · (03) 9369 9808 · web@kmtubular.com.au
ABN 72 661 249 270
Quotation
Q-26-0347
Date 08 Aug 2026
Valid until 07 Sep 2026
Prepared by David Vesely
Prepared for
Stellar Hotels Group
Attn: Owen Pritchard
owen.pritchard@stellarhotels.com.au
Level 9, 1 Queens Road, Melbourne, VIC
ABN 86 151 664 327
Accepted
| Item | Finish | Qty | Unit | Amount |
|---|---|---|---|---|
| KM-DAV-BS Dave Bench Setting | Charcoal Metallic | 4 | $1,355.00 | $5,420.00 |
| KM-MNG-BN The Mango Bench | Charcoal Metallic | 4 | $665.00 | $2,660.00 |
| Subtotal (ex GST) | $8,080.00 |
| GST 10% | $808.00 |
| Total (inc GST) | $8,888.00 |
Project: Rooftop — Dave bench settings
Finish: Charcoal Metallic powder coat unless noted. Delivery: Delivered metro Melbourne, inside ground floor.
Lead time: approx. 25 working days from acceptance and receipt of deposit. Terms: 30 days EOM.
Designed & manufactured in Melbourne since 1969