KM Tubular

Q-26-0347 · Stellar Hotels Group

Rooftop — Dave bench settings
Demo 19 Oct 2026
Accepted
Accepted 17 Aug 2026 — job J-26-0317
Stellar Hotels Group · Project pricing · 30 days EOM
Open job J-26-0317
Lines8 units · 2 lines
CodeProductFinishQtyUnitTotalMargin
KM-DAV-BS Dave Bench Setting Charcoal Metallic 4 $1,355.00 $5,420.00 47%
KM-MNG-BN The Mango Bench Charcoal Metallic 4 $665.00 $2,660.00 47%
Margin
Sell (ex GST)
$8,080
Material
$2,439
Labour
$1,814 · 25.2 h
Standard cost
$4,253
Margin
$3,827 · 47%
■ material■ labour■ margin
Standard cost is the BOM at today's material prices plus routing minutes at $72/h. Lead time 25 working days from acceptance.
KM Tubular
KM Tubular Industries Pty Ltd
403 Grieve Parade, Altona North VIC 3025 · (03) 9369 9808 · web@kmtubular.com.au
ABN 72 661 249 270
Quotation
Q-26-0347
Date 08 Aug 2026
Valid until 07 Sep 2026
Prepared by David Vesely
Prepared for
Stellar Hotels Group
Attn: Owen Pritchard
owen.pritchard@stellarhotels.com.au
Level 9, 1 Queens Road, Melbourne, VIC
ABN 86 151 664 327
Accepted
ItemFinishQtyUnitAmount
KM-DAV-BS Dave Bench SettingCharcoal Metallic4$1,355.00$5,420.00
KM-MNG-BN The Mango BenchCharcoal Metallic4$665.00$2,660.00
Subtotal (ex GST)$8,080.00
GST 10%$808.00
Total (inc GST)$8,888.00
Project: Rooftop — Dave bench settings Finish: Charcoal Metallic powder coat unless noted. Delivery: Delivered metro Melbourne, inside ground floor. Lead time: approx. 25 working days from acceptance and receipt of deposit. Terms: 30 days EOM.
Designed & manufactured in Melbourne since 1969