Accepted
Accepted 23 Jun 2026 — job J-26-0310
Swan Contract Furniture · Dealer pricing · 30 days EOM
Lines30 units · 2 lines
| Code | Product | Finish | Qty | Unit | Total | Margin | |
|---|---|---|---|---|---|---|---|
| KM-BYR-PB | Byron Pedestal Base | Black Satin | 24 | $278.00 | $6,672.00 | 45% | |
| KM-BYR-TPB | Byron Twin Pedestal Base | Black Satin | 6 | $414.00 | $2,484.00 | 45% | |
Margin
- Sell (ex GST)
- $9,156
- Material
- $3,157
- Labour
- $1,915 · 26.6 h
- Standard cost
- $5,072
- Margin
- $4,084 · 45%
■ material■ labour■ margin
Standard cost is the BOM at today's material prices plus routing minutes at $72/h. Lead time 15 working days from acceptance.
KM Tubular Industries Pty Ltd
403 Grieve Parade, Altona North VIC 3025 · (03) 9369 9808 · web@kmtubular.com.au
ABN 72 661 249 270
Quotation
Q-26-0340
Date 14 Jun 2026
Valid until 14 Jul 2026
Prepared by Jackie
Prepared for
Swan Contract Furniture
Attn: Kylie Morton
kylie@swancontract.com.au
9 Collingwood Street, Osborne Park, WA
ABN 52 109 446 380
Accepted
| Item | Finish | Qty | Unit | Amount |
|---|---|---|---|---|
| KM-BYR-PB Byron Pedestal Base | Black Satin | 24 | $278.00 | $6,672.00 |
| KM-BYR-TPB Byron Twin Pedestal Base | Black Satin | 6 | $414.00 | $2,484.00 |
| Subtotal (ex GST) | $9,156.00 |
| GST 10% | $915.60 |
| Total (inc GST) | $10,071.60 |
Project: Perth CBD fitout — Byron pedestals
Finish: Black Satin powder coat unless noted. Delivery: Delivered metro Melbourne, inside ground floor.
Lead time: approx. 15 working days from acceptance and receipt of deposit. Terms: 30 days EOM.
Designed & manufactured in Melbourne since 1969