KM Tubular

J-26-4779 · Urban Edge Interiors

Richmond tenancy fitout
MYOB · synced 08:52 Demo 23 Oct 2026
Invoiced
Done and invoiced
Urban Edge Interiors · Aisha Harris · PO URB-54096 · from Q-26-7192 · Monument Matt
Job value (ex GST)
$920
$920 invoiced · $0 to bill
On the floor
100%
Due
21 Oct
started 1 Oct
Forecast margin
52%
quoted at 52%
Work orders2 batches · 3.3 h estimated
WOProductQtyStationWhoEstActual
WO-26-31914
KM-B26-9211
KM-ECO-DB Eco Disc Base
Monument Matt
2 Complete Sio 1.3 h 1.4 h
WO-26-31915
KM-B26-9212
KM-CRD-BS The Credenza Base
Monument Matt
1 Complete Sio 2 h 1.9 h
Material reserved from the BOMs · $202
MaterialNeedsIssuedOn handAll jobsOn orderFreeStatusSupplier
D450 Disc 450 × 6 mm, laser cut 0 ea 2 141 97 0 44 Issued Westside Laser & Fold
TP250 Top plate 250 × 250 × 5 mm, 4 holes 0 ea 2 529 429 0 100 Issued Westside Laser & Fold
FIX-PK Fixing pack — table base 0 ea 3 997 607 0 390 Issued Häfele Australia
GL-FELT Felt-base glide insert 25.4 0 ea 6 1,866 1,086 0 780 Issued Richmond Wheel & Castor Co
BUB-R Bubble wrap 1500 mm (per m) 0 m 8 2,017 1,267 0 750 Issued Visy Packaging
CTN-L Carton — frame / chair 1200 × 800 × 600 0 ea 1 673 523 0 150 Issued Visy Packaging
CTN-S Carton — small base 650 × 650 × 250 0 ea 2 554 354 0 200 Issued Visy Packaging
PC-MON Powder — Monument Matt 0 kg 1.3 84 81.75 0 2.25 Issued Dulux Powder & Industrial Coatings
SS25 304 stainless SHS 25 × 25 × 1.2 0 m 1.2 99 49.8 0 49.2 Issued Atlas Steels
S25 SHS 25 × 25 × 1.6 0 m 6.8 521 264.4 0 256.6 Issued Orrcon Steel
T508 Round tube 50.8 × 2.0 ERW 0 m 1.4 115 19.6 0 95.4 Issued Orrcon Steel
Conversation — Q-26-7192 → J-26-4779 · 5 Outlook
↑ Ready for pick-up — J-26-4779 (URB-54096) Sio — Dispatch → Aisha Harris · J-26-4779 19 Oct 2026 · 15:40
Hi Aisha, Your order J-26-4779 — Richmond tenancy fitout — is packed and ready for pick-up from 403 Grieve Parade, Altona North. Dock hours 7:30–3:30 weekdays. 3 carton(s). Please quote J-26-4779 at the dock. Thanks, Sio — Dispatch
⛓ Sent from KM Tubular
↓ RE: Quotation Q-26-7192 — Richmond tenancy fitout Aisha Harris → David Vesely · Q-26-7192 · J-26-4779 30 Sep 2026 · 13:12
Hi David, All good — please go ahead with Q-26-7192. Our PO is URB-54096. Can you pack each base individually and label with our PO number? Thanks, Aisha
⛓ Quote number in subject
↑ Order confirmation J-26-4779 (your PO URB-54096) David Vesely → Aisha Harris · Q-26-7192 · J-26-4779 30 Sep 2026 · 10:18
Hi Aisha, Thanks for the order. It's booked in as job J-26-4779 against quote Q-26-7192, due 2026-10-21. Kind regards, David
⛓ Sent from KM Tubular
↑ Quotation Q-26-7192 — Richmond tenancy fitout David Vesely → Aisha Harris · Q-26-7192 25 Sep 2026 · 07:33
Hi Aisha, Thanks for the enquiry. Please find attached quotation Q-26-7192 for Richmond tenancy fitout — $920 ex GST, valid 30 days. Lead time is around 10 working days from order. You can accept online from the link in the quote. Kind regards, David Vesely KM Tubular Industries
⛓ Sent from KM Tubular
↓ Pricing — Richmond tenancy fitout Aisha Harris → David Vesely · Q-26-7192 24 Sep 2026 · 14:04
Hi David, Could you please quote the following for Richmond tenancy fitout: - 2 × Eco Disc Base, Monument Matt - 1 × The Credenza Base, Monument Matt We can pick up from Altona North. Thanks, Aisha Harris Project Manager | Urban Edge Interiors (03) 9429 6630
⛓ Sender matched to contact
Linesadding a line raises its work orders and reserves its material
CodeProductFinishQtyUnitTotal
KM-ECO-DB Eco Disc Base Monument Matt 2 $240.00 $480.00
KM-CRD-BS The Credenza Base Monument Matt 1 $440.00 $440.00
Job costing
Value
$920
Quoted cost
$440 · 52% margin
Material
$200
Labour
$241 · 3.4 h
Forecast cost
$441
Margin
$479 · 52%
Shop hours
3.3 h est · 3.4 h so far
Purchase ordersBoard →
Nothing ordered against this job.
Notes
Can you pack each base individually and label with our PO number?