KM Tubular

J-26-4750 · Mash Studios

Geelong residence
MYOB · synced 08:52 Demo 23 Oct 2026
Invoiced
Done and invoiced
Mash Studios · Ash Galea · PO MAS-68155 · from Q-26-7145 · Surfmist Matt
Job value (ex GST)
$650
$650 invoiced · $0 to bill
On the floor
100%
Due
19 Oct
started 25 Sep
Forecast margin
54%
quoted at 53%
Work orders1 batches · 2.6 h estimated
WOProductQtyStationWhoEstActual
WO-26-31849
KM-B26-9147
KM-CT600 CT 600 Table Frame
Surfmist Matt
2 Complete Sio 2.6 h 2.5 h
Material reserved from the BOMs · $123
MaterialNeedsIssuedOn handAll jobsOn orderFreeStatusSupplier
FIX-PK Fixing pack — table base 0 ea 2 997 607 0 390 Issued Häfele Australia
GL-M10 Adjustable glide M10 0 ea 8 2,267 1,267 0 1,000 Issued Richmond Wheel & Castor Co
TI-M8 Threaded insert M8 0 ea 8 2,836 836 0 2,000 Issued Häfele Australia
BUB-R Bubble wrap 1500 mm (per m) 0 m 6 2,017 1,267 0 750 Issued Visy Packaging
CTN-L Carton — frame / chair 1200 × 800 × 600 0 ea 2 673 523 0 150 Issued Visy Packaging
PC-SFM Powder — Surfmist Matt 0 kg 1.2 73 33.9 0 39.1 Issued Dulux Powder & Industrial Coatings
R5025 RHS 50 × 25 × 1.6 0 m 4.8 742 534.6 0 207.4 Issued Orrcon Steel
S40 SHS 40 × 40 × 1.6 0 m 6 498 290.8 0 207.2 Issued Orrcon Steel
Conversation — Q-26-7145 → J-26-4750 · 0 Outlook
No emails on this job yet.
Linesadding a line raises its work orders and reserves its material
CodeProductFinishQtyUnitTotal
KM-CT600 CT 600 Table Frame Surfmist Matt 2 $325.00 $650.00
Job costing
Value
$650
Quoted cost
$308 · 53% margin
Material
$120
Labour
$178 · 2.5 h
Forecast cost
$298
Margin
$352 · 54%
Shop hours
2.6 h est · 2.5 h so far
Purchase ordersBoard →
Nothing ordered against this job.
Delivery
DN-26-2749 Collected / delivered
Pick-up — Altona North · 16 Oct 2026 · signed Ash (collected)
Unit 4, 15 Thistlethwaite Street, South Melbourne VIC