KM Tubular

J-26-4662 · Northside Joinery & Fitout

Café fitout — Richmond
MYOB · synced 08:52 Demo 23 Oct 2026
Invoiced
Done and invoiced
Northside Joinery & Fitout · Sophie Wright · PO NOR-53948 · from Q-26-7021 · Monument Matt
Job value (ex GST)
$2,495
$2,495 invoiced · $0 to bill
On the floor
100%
Due
25 Sep
started 11 Sep
Forecast margin
49%
quoted at 51%
Work orders2 batches · 8.4 h estimated
WOProductQtyStationWhoEstActual
WO-26-31626
KM-B26-8926
KM-FRK-ST Franky Stool
Monument Matt
4 Complete Sio 4.2 h 4.6 h
WO-26-31627
KM-B26-8927
KM-DAV-BS Dave Bench Setting
Monument Matt
1 Complete Sio 4.2 h 4.3 h
Material reserved from the BOMs · $629
MaterialNeedsIssuedOn handAll jobsOn orderFreeStatusSupplier
FIX-PK Fixing pack — table base 0 ea 4 997 607 0 390 Issued Häfele Australia
GL-FELT Felt-base glide insert 25.4 0 ea 16 1,866 1,086 0 780 Issued Richmond Wheel & Castor Co
GL-M10 Adjustable glide M10 0 ea 8 2,267 1,267 0 1,000 Issued Richmond Wheel & Castor Co
CTN-S Carton — small base 650 × 650 × 250 0 ea 4 554 354 0 200 Issued Visy Packaging
PC-MON Powder — Monument Matt 0 kg 2.7 84 81.75 0 2.25 Issued Dulux Powder & Industrial Coatings
SEAT-BAM Bamboo stool seat 350 dia 0 ea 4 106 56 0 50 Issued Mathews Timber
SL-MER Merbau slat 70 × 19 0 lm 22 308 158 150 300 Issued Mathews Timber
R7525 RHS 75 × 25 × 1.6 0 m 4 185 72 0 113 Issued Orrcon Steel
S50 SHS 50 × 50 × 2.0 0 m 6.4 473 334.3 0 138.7 Issued Orrcon Steel
T254 Round tube 25.4 × 1.6 ERW 0 m 14.4 920 871.8 0 48.2 Issued Orrcon Steel
Conversation — Q-26-7021 → J-26-4662 · 0 Outlook
No emails on this job yet.
Linesadding a line raises its work orders and reserves its material
CodeProductFinishQtyUnitTotal
KM-FRK-ST Franky Stool Monument Matt 4 $285.00 $1,140.00
KM-DAV-BS Dave Bench Setting Monument Matt 1 $1,355.00 $1,355.00
Job costing
Value
$2,495
Quoted cost
$1,229 · 51% margin
Material
$624
Labour
$646 · 9 h
Forecast cost
$1,270
Margin
$1,225 · 49%
Shop hours
8.4 h est · 9 h so far
Running over the quoted cost — check the actual minutes on the work orders.
Purchase ordersBoard →
Nothing ordered against this job.