KM Tubular

J-26-4592 · Ballarat Office & Contract

Stock order
MYOB · synced 08:52 Demo 23 Oct 2026
Invoiced
Done and invoiced
Ballarat Office & Contract · Elena Wright · PO BAL-33984 · from Q-26-6912 · Charcoal Metallic
Job value (ex GST)
$586
$586 invoiced · $0 to bill
On the floor
100%
Due
18 Sep
started 31 Aug
Forecast margin
46%
quoted at 47%
Work orders1 batches · 1.6 h estimated
WOProductQtyStationWhoEstActual
WO-26-31441
KM-B26-8741
KM-BYR-PB Byron Pedestal Base
Charcoal Metallic
2 Complete Sio 1.6 h 1.7 h
Material reserved from the BOMs · $197
MaterialNeedsIssuedOn handAll jobsOn orderFreeStatusSupplier
D600 Disc 600 × 8 mm, laser cut 0 ea 2 14 130 30 -86 Issued Westside Laser & Fold
TP250 Top plate 250 × 250 × 5 mm, 4 holes 0 ea 2 529 429 0 100 Issued Westside Laser & Fold
FIX-PK Fixing pack — table base 0 ea 2 997 607 0 390 Issued Häfele Australia
BUB-R Bubble wrap 1500 mm (per m) 0 m 4 2,017 1,267 0 750 Issued Visy Packaging
CTN-S Carton — small base 650 × 650 × 250 0 ea 2 554 354 0 200 Issued Visy Packaging
PC-CHM Powder — Charcoal Metallic 0 kg 1 80 71.75 0 8.25 Issued Dulux Powder & Industrial Coatings
T762 Round tube 76.2 × 2.0 ERW (columns) 0 m 1.4 180 110.25 65 134.75 Issued Orrcon Steel
Conversation — Q-26-6912 → J-26-4592 · 0 Outlook
No emails on this job yet.
Linesadding a line raises its work orders and reserves its material
CodeProductFinishQtyUnitTotal
KM-BYR-PB Byron Pedestal Base Charcoal Metallic 2 $293.00 $586.00
Job costing
Value
$586
Quoted cost
$308 · 47% margin
Material
$193
Labour
$124 · 1.7 h
Forecast cost
$316
Margin
$270 · 46%
Shop hours
1.6 h est · 1.7 h so far
Invoices$586 of $586
INV-18732 Paid
Stock order
$586
Purchase ordersBoard →
Nothing ordered against this job.