KM Tubular

J-26-4519 · Laneway Hospitality Co

Dining room refresh
MYOB · synced 08:52 Demo 23 Oct 2026
Invoiced
Done and invoiced
Laneway Hospitality Co · Sam Nguyen · PO LAN-21633 · from Q-26-6809 · Black Satin
Job value (ex GST)
$325
$325 invoiced · $0 to bill
On the floor
100%
Due
10 Sep
started 20 Aug
Forecast margin
53%
quoted at 53%
Work orders1 batches · 0.8 h estimated
WOProductQtyStationWhoEstActual
WO-26-31242
KM-B26-8542
KM-BYR-PB Byron Pedestal Base
Black Satin
1 Complete Sio 0.8 h 0.8 h
Material reserved from the BOMs · $96
MaterialNeedsIssuedOn handAll jobsOn orderFreeStatusSupplier
D600 Disc 600 × 8 mm, laser cut 0 ea 1 14 130 30 -86 Issued Westside Laser & Fold
TP250 Top plate 250 × 250 × 5 mm, 4 holes 0 ea 1 529 429 0 100 Issued Westside Laser & Fold
FIX-PK Fixing pack — table base 0 ea 1 997 607 0 390 Issued Häfele Australia
BUB-R Bubble wrap 1500 mm (per m) 0 m 2 2,017 1,267 0 750 Issued Visy Packaging
CTN-S Carton — small base 650 × 650 × 250 0 ea 1 554 354 0 200 Issued Visy Packaging
PC-BLK Powder — Black Satin 0 kg 0.5 295 194.5 0 100.5 Issued Dulux Powder & Industrial Coatings
T762 Round tube 76.2 × 2.0 ERW (columns) 0 m 0.7 180 110.25 65 134.75 Issued Orrcon Steel
Conversation — Q-26-6809 → J-26-4519 · 0 Outlook
No emails on this job yet.
Linesadding a line raises its work orders and reserves its material
CodeProductFinishQtyUnitTotal
KM-BYR-PB Byron Pedestal Base Black Satin 1 $325.00 $325.00
Job costing
Value
$325
Quoted cost
$154 · 53% margin
Material
$96
Labour
$55 · 0.8 h
Forecast cost
$152
Margin
$173 · 53%
Shop hours
0.8 h est · 0.8 h so far