KM Tubular

J-26-4321 · Laneway Hospitality Co

Beer garden — outdoor settings
MYOB · synced 08:52 Demo 23 Oct 2026
Invoiced
Done and invoiced
Laneway Hospitality Co · Sam Nguyen · PO LAN-27998 · from Q-26-6525 · Black Satin
Job value (ex GST)
$800
$800 invoiced · $0 to bill
On the floor
100%
Due
11 Aug
started 21 Jul
Forecast margin
56%
quoted at 54%
Work orders2 batches · 3 h estimated
WOProductQtyStationWhoEstActual
WO-26-30688
KM-B26-7988
KM-FRK-ST Franky Stool
Black Satin
2 Complete Sio 2.1 h 2 h
WO-26-30689
KM-B26-7989
KM-TIM-TB Ti-me Table Base
Charcoal Metallic
1 Complete Sio 0.9 h 0.9 h
Material reserved from the BOMs · $153
MaterialNeedsIssuedOn handAll jobsOn orderFreeStatusSupplier
FB506 Flat bar 50 × 6 0 m 1.8 218 130.6 0 87.4 Issued Orrcon Steel
TP250 Top plate 250 × 250 × 5 mm, 4 holes 0 ea 1 529 429 0 100 Issued Westside Laser & Fold
FIX-PK Fixing pack — table base 0 ea 1 997 607 0 390 Issued Häfele Australia
GL-FELT Felt-base glide insert 25.4 0 ea 8 1,866 1,086 0 780 Issued Richmond Wheel & Castor Co
GL-M10 Adjustable glide M10 0 ea 3 2,267 1,267 0 1,000 Issued Richmond Wheel & Castor Co
BUB-R Bubble wrap 1500 mm (per m) 0 m 2 2,017 1,267 0 750 Issued Visy Packaging
CTN-S Carton — small base 650 × 650 × 250 0 ea 3 554 354 0 200 Issued Visy Packaging
PC-BLK Powder — Black Satin 0 kg 0.6 295 194.5 0 100.5 Issued Dulux Powder & Industrial Coatings
PC-CHM Powder — Charcoal Metallic 0 kg 0.45 80 71.75 0 8.25 Issued Dulux Powder & Industrial Coatings
SEAT-BAM Bamboo stool seat 350 dia 0 ea 2 106 56 0 50 Issued Mathews Timber
T254 Round tube 25.4 × 1.6 ERW 0 m 7.2 920 871.8 0 48.2 Issued Orrcon Steel
T508 Round tube 50.8 × 2.0 ERW 0 m 0.7 115 19.6 0 95.4 Issued Orrcon Steel
Conversation — Q-26-6525 → J-26-4321 · 0 Outlook
No emails on this job yet.
Linesadding a line raises its work orders and reserves its material
CodeProductFinishQtyUnitTotal
KM-FRK-ST Franky Stool Black Satin 2 $285.00 $570.00
KM-TIM-TB Ti-me Table Base Charcoal Metallic 1 $230.00 $230.00
Job costing
Value
$800
Quoted cost
$369 · 54% margin
Material
$151
Labour
$204 · 2.8 h
Forecast cost
$355
Margin
$445 · 56%
Shop hours
3 h est · 2.8 h so far
Purchase ordersBoard →
Nothing ordered against this job.