KM Tubular

J-26-4306 · Grand Pacific Hotels

Dining room refresh
MYOB · synced 08:52 Demo 23 Oct 2026
Invoiced
Done and invoiced
Grand Pacific Hotels · Luke Martin · PO GRA-69707 · from Q-26-6500 · Black Satin
Job value (ex GST)
$2,280
$2,280 invoiced · $0 to bill
On the floor
100%
Due
31 Jul
started 17 Jul
Forecast margin
50%
quoted at 50%
Work orders2 batches · 7.2 h estimated
WOProductQtyStationWhoEstActual
WO-26-30650
KM-B26-7950
KM-MNG-BN The Mango Bench
Black Satin
2 Complete Sio 4.2 h 4.3 h
WO-26-30651
KM-B26-7951
KM-RDB-1 Ripple Drum Base (Single)
White Satin
2 Complete Sio 3 h 2.9 h
Material reserved from the BOMs · $616
MaterialNeedsIssuedOn handAll jobsOn orderFreeStatusSupplier
D450 Disc 450 × 6 mm, laser cut 0 ea 2 141 97 0 44 Issued Westside Laser & Fold
TP250 Top plate 250 × 250 × 5 mm, 4 holes 0 ea 2 529 429 0 100 Issued Westside Laser & Fold
FIX-PK Fixing pack — table base 0 ea 6 997 607 0 390 Issued Häfele Australia
GL-M10 Adjustable glide M10 0 ea 8 2,267 1,267 0 1,000 Issued Richmond Wheel & Castor Co
BUB-R Bubble wrap 1500 mm (per m) 0 m 6 2,017 1,267 0 750 Issued Visy Packaging
CTN-L Carton — frame / chair 1200 × 800 × 600 0 ea 2 673 523 0 150 Issued Visy Packaging
PC-BLK Powder — Black Satin 0 kg 1.4 295 194.5 0 100.5 Issued Dulux Powder & Industrial Coatings
PC-WHT Powder — White Satin 0 kg 1.2 146 70.8 0 75.2 Issued Dulux Powder & Industrial Coatings
SH16 Mild steel sheet 2400 × 1200 × 1.6 0 sheet 0.7 48 34.78 0 13.22 Issued Orrcon Steel
SL-MOD ModWood slat 88 × 23, Silver Gum 0 lm 18 105 135 150 120 Issued ModWood Technologies
R7525 RHS 75 × 25 × 1.6 0 m 4 185 72 0 113 Issued Orrcon Steel
S50 SHS 50 × 50 × 2.0 0 m 6 473 334.3 0 138.7 Issued Orrcon Steel
Conversation — Q-26-6500 → J-26-4306 · 0 Outlook
No emails on this job yet.
Linesadding a line raises its work orders and reserves its material
CodeProductFinishQtyUnitTotal
KM-MNG-BN The Mango Bench Black Satin 2 $665.00 $1,330.00
KM-RDB-1 Ripple Drum Base (Single) White Satin 2 $475.00 $950.00
Job costing
Value
$2,280
Quoted cost
$1,135 · 50% margin
Material
$616
Labour
$517 · 7.2 h
Forecast cost
$1,133
Margin
$1,147 · 50%
Shop hours
7.2 h est · 7.2 h so far
Invoices$2,280 of $2,280
INV-18446 Paid
Dining room refresh
$2,280
Purchase ordersBoard →
Nothing ordered against this job.