KM Tubular

J-26-4200 · Geelong Fitout Co

Ringwood tenancy fitout
MYOB · synced 08:52 Demo 23 Oct 2026
Invoiced
Done and invoiced
Geelong Fitout Co · Paul Mifsud · PO GEE-84361 · from Q-26-6348 · Black Satin
Job value (ex GST)
$1,625
$1,625 invoiced · $0 to bill
On the floor
100%
Due
16 Jul
started 1 Jul
Forecast margin
52%
quoted at 53%
Work orders1 batches · 4 h estimated
WOProductQtyStationWhoEstActual
WO-26-30368
KM-B26-7668
KM-BYR-PB Byron Pedestal Base
Black Satin
5 Complete Sio 4 h 4.1 h
Material reserved from the BOMs · $482
MaterialNeedsIssuedOn handAll jobsOn orderFreeStatusSupplier
D600 Disc 600 × 8 mm, laser cut 0 ea 5 14 130 30 -86 Issued Westside Laser & Fold
TP250 Top plate 250 × 250 × 5 mm, 4 holes 0 ea 5 529 429 0 100 Issued Westside Laser & Fold
FIX-PK Fixing pack — table base 0 ea 5 997 607 0 390 Issued Häfele Australia
BUB-R Bubble wrap 1500 mm (per m) 0 m 10 2,017 1,267 0 750 Issued Visy Packaging
CTN-S Carton — small base 650 × 650 × 250 0 ea 5 554 354 0 200 Issued Visy Packaging
PC-BLK Powder — Black Satin 0 kg 2.5 295 194.5 0 100.5 Issued Dulux Powder & Industrial Coatings
T762 Round tube 76.2 × 2.0 ERW (columns) 0 m 3.5 180 110.25 65 134.75 Issued Orrcon Steel
Conversation — Q-26-6348 → J-26-4200 · 0 Outlook
No emails on this job yet.
Linesadding a line raises its work orders and reserves its material
CodeProductFinishQtyUnitTotal
KM-BYR-PB Byron Pedestal Base Black Satin 5 $325.00 $1,625.00
Job costing
Value
$1,625
Quoted cost
$770 · 53% margin
Material
$482
Labour
$294 · 4.1 h
Forecast cost
$776
Margin
$849 · 52%
Shop hours
4 h est · 4.1 h so far
Purchase ordersBoard →
Nothing ordered against this job.